Rico Asphalt Repair
Quote Tool
Quote
INVOICE TO
Site / Address
DATE
--
Invoice no : 00001
Areas
| Description | Length | Width | Thickness | Area | Tons |
|---|
| Description | Qty | Amount |
|---|---|---|
| Total | ||
| Tons | 0.00 | |
| Material | £0.00 | |
| GRAND TOTAL : | £0.00 |
Term and Conditions :
Rico Asphalt Repair
Our contact
-
787 688 0094
-
-
Parking and Road Solutions
OUR
CONTACT
Rico Asphalt Repair
Parking and Road Solutions / 787 688 0094 / [email protected]
Asphalt • Paving • Repair
Client & Project
Sections under General Notes
1. Prep
2. Scarify (if necessary)
3. Level and Grade (if necessary)
4. Pave
5. Compact
6. Line Striping (if necessary)
Areas
| Description | Length (ft) | Width (ft) | Thickness (in) | Area (sq ft) | Tons | Actions |
|---|---|---|---|---|---|---|
| Totals | 3000.00 | 54.55 |
Quote Adjustments (Admin-priced)
| Item | Mode | Qty | Unit | Rate | Amount | Actions |
|---|---|---|---|---|---|---|
| Adjustments Total | $0.00 | |||||
Rates are controlled by admin. User only chooses item + quantity.
Material-only pricing. Coverage used internally: 110 sq ft per ton per 1" thickness.
Quote Preview
Tons54.55
Material$5,727.27
Total$5,727.27
Rico Asphalt Repair
Parking and Road Solutions / 787 688 0094 / [email protected]
Bill To / Project
Client: Client Name
Contact:
[email protected] • (555) 111-2222
Job: JOB-2025-001
Site: Worksite Address
12/1/2025, 11:34:23 AM
General Notes
Overlay asphalt across listed areas; compact and finish as needed.
Sections under General Notes
1. Prep
Mobilize crew and equipment. Protect adjacent surfaces. Set traffic control as needed. Clean work area of loose debris and vegetation.
2. Scarify (if necessary)
Scarify/broom existing asphalt surface where required to improve bonding. Remove loose material as directed.
3. Level and Grade (if necessary)
Place leveling course at low/high areas to promote drainage and smooth transitions. Fine grade to match existing elevations.
4. Pave
Place hot mix asphalt to the specified thickness across marked areas. Maintain temperature and uniform mat; handwork edges and joints.
5. Compact
Compact asphalt with roller/plate compactor for a dense, smooth finish and proper cross-slope. Seal edges as needed.
6. Line Striping (if necessary)
Stripe per existing layout or plan using DOT‑compliant traffic paint. Include stalls, accessible markings, and arrows as required.
Areas
| Description | Length | Width | Thickness | Area | Tons |
|---|---|---|---|---|---|
| Area 1 | 100.00 ft | 30.00 ft | 2.00 in | 3000.00 | 54.55 |
| Totals | 3000.00 | 54.55 | |||
| Description | Qty | Amount |
|---|---|---|
| Asphalt material | 54.55 tons | $5,727.27 |
| Total | $5,727.27 | |
Terms & Conditions
Price valid for 30 days. Work subject to weather conditions and site accessibility. Unforeseen subsurface conditions may require a change order. Client is responsible for traffic control, permits, and utility locates unless otherwise agreed in writing. Fifty percent (50%) of the total contract price is due upon contract approval, with the remaining fifty percent (50%) due upon completion of the work, unless other payment terms are expressly stated in the proposal.
Authorized Signature
Client Signature