
Cayey Road Reconstruction
The work was successfully completed. Doing the job in three major steps, including regrading the entire side of the hill, repairing and extending the drainage tube as well as constructing a new drain catch basin in concrete, and eventually paving 2 inches of asphalt over the whole road.








