Rico Asphalt Repair

Quote Tool

Quote
INVOICE TO
Site / Address
DATE
--
Invoice no : 00001
Areas
Description Length Width Thickness Area Tons
Description Qty Amount
Total
Tons 0.00
Material £0.00
GRAND TOTAL : £0.00
Term and Conditions :
Rico Asphalt Repair
OUR
CONTACT
787 688 0094
📍 Parking and Road Solutions
RAR — Asphalt Quote (Material Only)

Rico Asphalt Repair
Parking and Road Solutions / 787 688 0094 / [email protected]
Asphalt • Paving • Repair

Client & Project

Sections under General Notes

1. Prep

2. Scarify (if necessary)

3. Level and Grade (if necessary)

4. Pave

5. Compact

6. Line Striping (if necessary)

Areas

DescriptionLength (ft)Width (ft)Thickness (in)Area (sq ft)TonsActions
Totals3000.0054.55

Quote Adjustments (Admin-priced)

Item Mode Qty Unit Rate Amount Actions
Adjustments Total $0.00
Rates are controlled by admin. User only chooses item + quantity.
Material-only pricing. Coverage used internally: 110 sq ft per ton per 1" thickness.

Quote Preview

Tons54.55
Material$5,727.27
Total$5,727.27
Rico Asphalt Repair
Parking and Road Solutions / 787 688 0094 / [email protected]

Bill To / Project

Client: Client Name
Contact: [email protected](555) 111-2222
Job: JOB-2025-001
Site: Worksite Address
12/1/2025, 11:34:23 AM

General Notes

Overlay asphalt across listed areas; compact and finish as needed.

Sections under General Notes

1. Prep
Mobilize crew and equipment. Protect adjacent surfaces. Set traffic control as needed. Clean work area of loose debris and vegetation.
2. Scarify (if necessary)
Scarify/broom existing asphalt surface where required to improve bonding. Remove loose material as directed.
3. Level and Grade (if necessary)
Place leveling course at low/high areas to promote drainage and smooth transitions. Fine grade to match existing elevations.
4. Pave
Place hot mix asphalt to the specified thickness across marked areas. Maintain temperature and uniform mat; handwork edges and joints.
5. Compact
Compact asphalt with roller/plate compactor for a dense, smooth finish and proper cross-slope. Seal edges as needed.
6. Line Striping (if necessary)
Stripe per existing layout or plan using DOT‑compliant traffic paint. Include stalls, accessible markings, and arrows as required.

Areas

DescriptionLengthWidthThicknessAreaTons
Area 1100.00 ft30.00 ft2.00 in3000.0054.55
Totals3000.0054.55
DescriptionQtyAmount
Asphalt material54.55 tons$5,727.27
Total$5,727.27

Terms & Conditions

Price valid for 30 days. Work subject to weather conditions and site accessibility. Unforeseen subsurface conditions may require a change order. Client is responsible for traffic control, permits, and utility locates unless otherwise agreed in writing. Fifty percent (50%) of the total contract price is due upon contract approval, with the remaining fifty percent (50%) due upon completion of the work, unless other payment terms are expressly stated in the proposal.
Authorized Signature
Client Signature